We covered that. Did you miss my post (#19) above?
Cheers!
Cheers!
Is it possible to embed text labels on the surface for those connectors & ports?
Like "Heat" and "Cool" (or at least "H" and "C") above the duplex sockets?
The problem is: I'll bet he's got a > 1 day print there. If I were to guess, it's only about $5 in material, but tying up your printer for another day for an H and C is an emotional decision he needs to make.
For the RJ45 jacks it says you can wire them in series like you did. That's actually parallel. But that's nitpicking.
An enhancement I recommend is using a fused IEC power inlet. Say 8-10 amp fuse. But make sure it's one that has legitimate safety certifications. CSA/UL or whatever. The only way to ensure those certs are legit is to buy it from a responsible supplier. (Mouser, Digikey, etc.)
Such as these.An enhancement I recommend is using a fused IEC power inlet. Say 8-10 amp fuse. But make sure it's one that has legitimate safety certifications. CSA/UL or whatever. The only way to ensure those certs are legit is to buy it from a responsible supplier. (Mouser, Digikey, etc.)
What is "wrong" with my Controller Box?
Where is Dad's Pencil Sharpener in the box?No, I am referring to the switched AC bulkhead, as shown in the OP's illustration and outlined here:
View attachment 708978
Sadly, these are consistently mis-represented as "10 AMP" bulkheads even while the switch modules have "6A" molded into their shells...
Cheers!
Enter your email address to join: