Recycling this thread since I finally have gotten contractors out to give me estimates for electrical and plumbing.
Here's what I currently have mocked up (obviously not to exact scale). I am open to swapping the sink and eBIAB system, but I don't want the sink to go too far to the left because the laundry room where the plumbing will be piped off is behind that area. The door to the house is to the right of the sink in this image. The workspace will occupy however much linear footage I have between the ferm freezer and the eBIAB (or sink).
View attachment 768707
I am having trouble visualizing my faucet(s) in this scenario. I'd like to have a faucet for the sink, but also have a spigot (probably cold only) for filling the eBIAB, feeding my steam slayer, and feeding the immersion chiller. What are y'all's thoughts on this layout?
I'd hoped to drain the Steam Slayer into the sink, but it may need to go into a bucket.